{"id":2948,"date":"2015-06-23T13:17:50","date_gmt":"2015-06-23T13:17:50","guid":{"rendered":"http:\/\/offices.org.uk\/?p=2948"},"modified":"2015-06-23T13:17:50","modified_gmt":"2015-06-23T13:17:50","slug":"cheesegrater-remedial-works-cost-engineers-6million","status":"publish","type":"post","link":"https:\/\/offices.org.uk\/news\/?p=2948","title":{"rendered":"Cheesegrater remedial works to cost engineers \u00a36million"},"content":{"rendered":"
\t\t\t\tSTEEL specialist Severfield has revealed it will spend \u00a36million on remedial work at the Leadenhall Building in the City of London<\/a>. <\/p>\n Two bolts fell from the 225-metre tall skyscaper, known as the Cheesegrater, last November. In January, a third bolt fell from the building at 122 Leadenhall Street. <\/p>\n Most of the 3,000 bolts used by Severfield in the building are to be replaced and the listed company disclosed in its year-end results that the remedial works will cost \u00a36million. <\/p>\n Speaking to newspaper City AM<\/a>, Severfield’s chief executive Ian Lawson said: “These bolts were a specialist product. It is the first time we\u2019ve used them and it is unlikely we will use them again.” <\/p>\n Other major projects that Severfield has worked on previously include The Shard, the Olympic Stadium, and Tate Modern.\t\t<\/p>\n","protected":false},"excerpt":{"rendered":" STEEL specialist Severfield has revealed it will spend \u00a36million on remedial work at the Leadenhall Building in the City of London. Two bolts fell from the 225-metre tall skyscaper, known as the Cheesegrater, last November. In January, a third bolt … Continue reading